User manual INTEL D945PWM

DON'T FORGET : ALWAYS READ THE USER GUIDE BEFORE BUYING !!!

If this document matches the user guide, instructions manual or user manual, feature sets, schematics you are looking for, download it now. Diplodocs provides you a fast and easy access to the user manual INTEL D945PWM. We hope that this INTEL D945PWM user guide will be useful to you.


INTEL D945PWM : Download the complete user guide (2779 Ko)

Manual abstract: user guide INTEL D945PWM

Detailed instructions for use are in the User's Guide.

[. . . ] Intel Desktop Board D945PWM Product Guide Order Number: D44265-001 Revision History Revision -001 Revision History First release of the Intel Desktop Board D945PWM Product Guide. Date January 2006 If an FCC declaration of conformity marking is present on the board, the following statement applies: FCC Declaration of Conformity This device complies with Part 15 of the FCC Rules. Operation is subject to the following two conditions: (1) this device may not cause harmful interference, and (2) this device must accept any interference received, including interference that may cause undesired operation. For questions related to the EMC performance of this product, contact: Intel Corporation 5200 N. E. [. . . ] Wiring and cables must also be UL listed or recognized and suitable for the intended use. The FCC Class B logo for home or office use signifies compliance with electromagnetic interference (EMI) requirements. In Canada A nationally recognized certification mark such as CSA or cUL signifies compliance with safety requirements. The Industry Canada statement at the front of this product guide demonstrates compliance with Canadian EMC regulations. Prevent Power Supply Overload Do not overload the power supply output. To avoid overloading the power supply, make sure that the calculated total current loads of all the modules within the computer is less than the output current rating of each of the power supplies output circuits. Place Battery Marking CAUTION Risk of explosion if the battery is replaced with an incorrect type. Disposal of used batteries must be in accordance with local environmental regulations. There is insufficient space on this desktop board to provide instructions for replacing and disposing of the Lithium ion coin cell battery. For system safety certification, the above statement or equivalent statement is required to be permanently and legibly marked on the chassis near the battery. Related Links: For information about replacing the battery, go to page 48. 25 Intel Desktop Board D945PWM Product Guide Use Only for Intended Applications All Intel desktop boards are evaluated as Information Technology Equipment (I. T. E. ) for use in personal computers (PC) for installation in homes, offices, schools, computer rooms, and similar locations. The suitability of this product for other PC or embedded non-PC applications or other environments, such as medical, industrial, alarm systems, test equipment, etc. , may not be supported without further evaluation by Intel. Related Links: For information about regulatory compliance, go to Appendix B on page 59. Installing the I/O Shield The desktop board comes with an I/O shield. When installed in the chassis, the shield blocks radio frequency transmissions, protects internal components from dust and foreign objects, and promotes correct airflow within the chassis. Install the I/O shield before installing the desktop board in the chassis. If the shield doesn't fit, obtain a properly-sized shield from the chassis supplier. OM19101 Figure 4. Installing the I/O Shield 26 Installing and Replacing Desktop Board Components Installing and Removing the Desktop Board CAUTION Only qualified technical personnel should do this procedure. Disconnect the computer from its power source before performing the procedures described here. Failure to disconnect the power before you open the computer can result in personal injury or equipment damage. Refer to your chassis manual for instructions on installing and removing the desktop board. Figure 5 shows the location of the 11 mounting screw holes for Desktop Board D945PWM. OM19102 Figure 5. Desktop Board D945PWM Mounting Screw Hole Locations 27 Intel Desktop Board D945PWM Product Guide Installing and Removing a Processor Instructions on how to install the processor to the desktop board are given below. Installing a Processor CAUTION Before installing or removing the processor, make sure the AC power has been removed by unplugging the power cord from the computer; the standby power LED should not be lit (see Figure 3 on page 20). Open the socket lever by pushing the lever down and away from the socket (see Figure 6, A and B). A B OM17210 Figure 6. Do not touch the socket contacts (see Figure 7, C and D). C D D OM19103 Figure 7. [. . . ] Please consult the http://www. intel. com/intel/other/ehs/product_ecology/Recycling_Program. htm for the details of this program, including the scope of covered products, available locations, shipping instructions, terms and conditions, etc. Intel Product Recycling Program http://www. intel. com/intel/other/ehs/product_ecology/Recycling_Program. htm Deutsch Als Teil von Intels Engagement fr den Umweltschutz hat das Unternehmen das Intel ProduktRecyclingprogramm implementiert, das Einzelhandelskunden von Intel Markenprodukten ermglicht, gebrauchte Produkte an ausgewhlte Standorte fr ordnungsgemes Recycling zurckzugeben. Details zu diesem Programm, einschlielich der darin eingeschlossenen Produkte, verfgbaren Standorte, Versandanweisungen, Bedingungen usw. , finden Sie auf der http://www. intel. com/intel/other/ehs/product_ecology/Recycling_Program. htm Espaol Como parte de su compromiso de responsabilidad medioambiental, Intel ha implantado el programa de reciclaje de productos Intel, que permite que los consumidores al detalle de los productos Intel devuelvan los productos usados en los lugares seleccionados para su correspondiente reciclado. Consulte la http://www. intel. com/intel/other/ehs/product_ecology/Recycling_Program. htm para ver los detalles del programa, que incluye los productos que abarca, los lugares disponibles, instrucciones de envo, trminos y condiciones, etc. 61 Intel Desktop Board D945PWM Product Guide Franais Dans le cadre de son engagement pour la protection de l'environnement, Intel a mis en oeuvre le programme Intel Product Recycling Program (Programme de recyclage des produits Intel) pour permettre aux consommateurs de produits Intel de recycler les produits uss en les retournant des adresses spcifies. Visitez la page Web http://www. intel. com/intel/other/ehs/product_ecology/Recycling_Program. htm pour en savoir plus sur ce programme, savoir les produits concerns, les adresses disponibles, les instructions d'expdition, les conditions gnrales, etc. http://www. intel. com/intel/ other/ehs/product_ecology/Recycling_Program. htm Malay Sebagai sebahagian daripada komitmennya terhadap tanggungjawab persekitaran, Intel telah melaksanakan Program Kitar Semula Produk untuk membenarkan pengguna-pengguna runcit produk jenama Intel memulangkan produk terguna ke lokasi-lokasi terpilih untuk dikitarkan semula dengan betul. [. . . ]

DISCLAIMER TO DOWNLOAD THE USER GUIDE INTEL D945PWM




Click on "Download the user Manual" at the end of this Contract if you accept its terms, the downloading of the manual INTEL D945PWM will begin.

 

Copyright © 2015 - manualRetreiver - All Rights Reserved.
Designated trademarks and brands are the property of their respective owners.