User manual CISSELL 36BS30

DON'T FORGET : ALWAYS READ THE USER GUIDE BEFORE BUYING !!!

If this document matches the user guide, instructions manual or user manual, feature sets, schematics you are looking for, download it now. Diplodocs provides you a fast and easy access to the user manual CISSELL 36BS30. We hope that this CISSELL 36BS30 user guide will be useful to you.


CISSELL 36BS30 : Download the complete user guide (2011 Ko)

Manual abstract: user guide CISSELL 36BS30

Detailed instructions for use are in the User's Guide.

[. . . ] THE WARRANTIES GIVEN ABOVE ARE EXPRESSLY IN LIEU OF ALL OTHER WARRANTIES, EXPRESS OR IMPLIED. CISSELL NEITHER ASSUMES, NOR AUTHORIZES ANY PERSON TO ASSUME FOR IT, ANY OTHER WARRANTY OR LIABILITY IN CONNECTION WITH THE MANUFACTURE, USE OR SALE OF ITS EQUIPMENT OR PARTS. For warranty service, contact the Distributor from whom the Cissell equipment or part was purchased. If the Distributor cannot be reached, contact Cissell. Page 1 PUFF IRON MODEL "E" TABLE OF CONTENTS GENERAL INFORMATION & INSTALLATION Warranty . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . [. . . ] 21 Page 2 OPERATING INSTRUCTIONS CAUTION: Compliance with ANSI Z8. 1-1990 (Standard for Commercial Laundry and Drycleaning Operations) requires that each Puff Iron head be covered with at least one thickness of double-face flannel and suitable cloth cover. Open, first the return line, then the globe valve in steam line and allow Puff Iron to warm up. Place area of garment to be finished over the head and press foot pedal for steaming. If unit is equipped with vacuum, after steaming, press foot pedal to activate the vacuum. Page 3 Page 4 Page 5 Page 6 INSTRUCTIONS FOR STEAM CONNECTIONS FOR PUFF IRONS IMPORTANT: INSTALL STEAM PIPING IN ACCORDANCE WITH ALL LOCAL REGULATIONS AND REQUIREMENTS. 1. To prevent condensate draining from headers to machine, piping should have a minimum riser 12" above each respective header as illustrated. Do not make steam connection to header with a horizontal or downwardly facing tee or elbow. Whenever possible, horizontal runs of steam must drain, by gravity, to respective steam header. Water pocket or an improperly drained steam header will provide wet steam cauing unecessary wetting-out of head covers. In both the steam supply and steam return line, it is recommended that each have a 1/ 2" union and 1/2" globe valve. This will enable you to disconnect the steam connections and block steam flow to and from machine while servicing machine. Before installing trap and check valve in steam return line, open globe valve in steam supply line to allow steam to flow through machine to flush out any dirt and scale from machine. of 6) P508 Center Brace Support Page 10 TEE PIPE & VACUUM MANIFOLD PARTS Ref. P557 P551 P549 P550 P251 P257 P259 P271 P253 P256 P276 P277 M263 P252 Description Tee Pipe for 33" Double Table Tee Pipe for 38" Triple Table Tee Pipe for Single Table Straight Pipe for 38" Triple Table Vacuum Manifold for 38" Triple Table 40 5/8" Lg. "O" Ring 1 1/4" Union with "O" Ring #8 - 3/8" S. M. S. P261 P262 P298 M280 P273 TU2846 TU4934 C249 TU2814 P98 P126 P132 P177 P133 Description 3/4" x 13" Black Pipe Jacket (Regular) Jacket (Vacuum) 1/4" - 20 x 1" Carriage Bolt (Pkg. of 6) Support Bar for 15 1/2" Table Support Bar for 33" Table Support Bar for 38" Table Ref. P228 P260 P299 P542 P267 P266 WITH VACUUM Description Pedal 3/8" x 7 1/2" Black Pipe Flange Adapter (Vacuum) 2/3 - 3/4" Union - NPT Flange (Vacuum) Flange (Regular) (See separate page) (See separate page) Pedal Rod & Yoke Ass'y. Pedal Bearing Wrench (1/8") P255 P36 Page 12 CENTRAL AIR VACUUM VALVE &UPSTREAM VALVE SINGLE OR DOUBLE PARTS P368 P543 P548 P544 P546 Central Air Vacuum Valve - Consists of Ref. P301 P226 P246 P244 P223 P252 P232 OP547 V15 P237 P371 ** P254 ** SF49 Description Rubber Tubing w/Spring Valve Seat Valve Seal w/Stem Spring (Pkg 6) Valve Body Hose Adapter Rubber Tubing 3/4" - 16 x 1/4" Lock Nut Small Lock Nut (Pkg. K361 K362 P236 P536 P372 Description Single Valve Body NPT w/Union Double Valve Body NPT w/Union Copper Gasket (Pkg. Support Bracket * 20 21 22 23 24 25 * 26 28 P695 V05 P33H P126 V345 P375 P238 K605 "O" Ring Large Pack Nut Spring Retainer 1/4" - 20 x 1" Aln St Scr. 4c (22") Sleever Head FABRIC PRESSING HEAD PARTS - PIF224 Ref. [. . . ] To set spring into position, a dimension of about 3/4" should be maintained. Shut off steam to Puff Iron, depress foor pedal to release steam pressure and allow machine to cool. Using a 1/8" allen wrench, loosen set screw located in spring retainer. After removing spring holder, old spring will slide down valve stem and new spring will slide into position. [. . . ]

DISCLAIMER TO DOWNLOAD THE USER GUIDE CISSELL 36BS30




Click on "Download the user Manual" at the end of this Contract if you accept its terms, the downloading of the manual CISSELL 36BS30 will begin.

 

Copyright © 2015 - manualRetreiver - All Rights Reserved.
Designated trademarks and brands are the property of their respective owners.