User manual 3COM S9508 SOFTWARE

DON'T FORGET : ALWAYS READ THE USER GUIDE BEFORE BUYING !!!

If this document matches the user guide, instructions manual or user manual, feature sets, schematics you are looking for, download it now. Diplodocs provides you a fast and easy access to the user manual 3COM S9508 SOFTWARE. We hope that this 3COM S9508 SOFTWARE user guide will be useful to you.


3COM S9508 SOFTWARE : Download the complete user guide (10531 Ko)

Manual abstract: user guide 3COM S9508 SOFTWARE

Detailed instructions for use are in the User's Guide.

[. . . ] H3C S9500 Series Routing Switches Installation Manual Hangzhou H3C Technologies Co. , Ltd. http://www. h3c. com Manual Version: T2-08048T-20071015-C-1. 24 Product Version: S9500-CMW310-R1632P03 Copyright © 2006-2007, Hangzhou H3C Technologies Co. , Ltd. and its licensors All Rights Reserved No part of this manual may be reproduced or transmitted in any form or by any means without prior written consent of Hangzhou H3C Technologies Co. , Ltd. Trademarks H3C, , Aolynk, , H3Care, , TOP G, , IRF, NetPilot, Neocean, NeoVTL, SecPro, SecPoint, SecEngine, SecPath, Comware, Secware, Storware, NQA, VVG, V2G, VnG, PSPT, XGbus, N-Bus, TiGem, InnoVision and HUASAN are trademarks of Hangzhou H3C Technologies Co. , Ltd. All other trademarks that may be mentioned in this manual are the property of their respective owners. Notice The information in this document is subject to change without notice. [. . . ] If the fiber has to pass through a metallic board hole, the hole must have a sleek and fully filleted surface (the filleting radius must be not less than 2 mm). When passing through a metallic board hole or bending along the acute side of mechanical parts, the fiber must wear jackets or cushions. Never exert a fierce force to the fiber or plug; otherwise the plug may be damaged or the fiber may be broken. For the allowed maximum tensile load and crush load, refer to Table 3-4. Table 3-4 Allowed maximum tensile force and crush load Period of force Short period Long term 150 80 Tensile load (N) Crush load (N/100 mm) 500 100 3-26 Installation Manual H3C S9500 Series Routing Switches Chapter 3 Switch Installation IV. Connection procefure 1) 2) Connect one end of the fiber to the SFP module of the S9500 series. Connect the other end of the fiber to the peer device. 3. 10 Verifying the Installation Warning: Make sure that you have turned off the power before checking the installation in case of bodily injury and device damage. After installing the switch, verify the installation against the following list. Table 3-5 Installation checklist Item Console cable PGND wire Power cables SRPUs LPUs/service boards Fan tray(s) PSUs Normal Abnormal (Description) 3-27 Installation Manual H3C S9500 Series Routing Switches Table of Contents Table of Contents Chapter 4 System Commissioning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-1 4. 1 Setting Up Configuration Environment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-1 4. 1. 1 Setting Up Configuration Environment. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-1 4. 1. 2 Setting Terminal Parameters . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-1 4. 2 Powering On the Switch . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-4 4. 2. 1 Checklist for Switch Power-On. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-4 4. 2. 2 Powering on the Switch. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-5 4. 2. 3 Verifying after Power-on (Recommended). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-5 4. 2. 4 Boot Interface . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-5 i Installation Manual H3C S9500 Series Routing Switches Chapter 4 System Commissioning Chapter 4 System Commissioning 4. 1 Setting Up Configuration Environment 4. 1. 1 Setting Up Configuration Environment Connect a terminal (a PC in this example) to the switch with the console cable. Figure 4-1 Connect a PC to the switch with a Console cable 4. 1. 2 Setting Terminal Parameters This section describes how to set the terminal parameters. The following uses a PC running Windows XP HyperTerminal as an example. Select Start > Programs > Accessories > Communications > HyperTerminal in the window to set up a new to access the HyperTerminal window. The Connection Description dialog box appears, as shown in Figure 4-2. . 4-1 Installation Manual H3C S9500 Series Routing Switches Chapter 4 System Commissioning Figure 4-2 Connection Description interface of HyperTerminal 3) Enter the name of the new connection in the Connection Description dialog box, and click OK. Select a port in the Connect using drop-down list. Figure 4-3 Select a port for the HyperTerminal connection 4) Set serial port parameters. [. . . ] For example, if the label on the loaded cabinet side is "A01-BGND", it means that the power cable is a BGND that connects BGND copper bar in the power distribution box on Row A, Column 01 in the machine room. Information on the labels for PGND cables should be given in the similar way. B. 4. 2 Labels for AC Power Cables The labels are affixed to the AC cables that provide power for the cabinets, and the protection grounding cables, including the POWER, PGND, and BGND cables. The 220V AC cables and related PGND and BGND cables are covered with insulating sheath, so the labels only need to contain the words of "AC" and the cabinet number. The labels for AC power cables are affixed to one side of the identification plates on cable ties. I. [. . . ]

DISCLAIMER TO DOWNLOAD THE USER GUIDE 3COM S9508 SOFTWARE




Click on "Download the user Manual" at the end of this Contract if you accept its terms, the downloading of the manual 3COM S9508 SOFTWARE will begin.

 

Copyright © 2015 - manualRetreiver - All Rights Reserved.
Designated trademarks and brands are the property of their respective owners.